I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes.
Click to Support Signs101 ...
We have a set of channel letters we will be installing on a 5/8” drywall with backer plywood interior fascia. Metal studs on 16” ctrs.
We have 6’ whips with Class 2 LED wire for each letter with a single power supply to be mounted behind wall.
Do we have to use pass thrus for each letter...
Hello everyone,
We have had a failure with this sign. The acrylic white backer separated from the DiBond panels in areas. We used tape (not VHB) and silicone adhesive to mount the acrylic to back of ACM panels.
The two acrylic panels per side were 4’x4’ for top panel logo and 2’ x 7’ for...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.