• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Construction site / job site sign stands

slappy

New Member
I need to build one for a 4x8 and have never done this before but willing to open new doors. I was wondering if anyone had any pictures or the stands that have built or plans for them.

thanks :loveya:
 

Billct2

Active Member
Single Side, double side? I'm assuming it has to be free standing or you wouldn't be asking.
We have built them like a giant a frame, 2x4 frame, dibond faces and unfold on site then add a couple bottom
pieces and throw on something for weight.
 

MikePro

New Member
http://www.signs101.com/forums/showthread.php?64145-need-your-input

I like making these T-Frames for easy-to-install MDO signs. No digging necessary, and completely re-usable.
Pics/Diagram/Description in that thread, but the legs are basically a "T" of 4x4's supported with 45degree 2x4's. drill holes in the legs and pound 2-3ft of rebar through it and into the ground.

noted: that picture in the thread was of a frame I had designed on site to work with the slope of the hill it was installed on. I'll usually attach all my legs on one plane, like the diagram in that same thread.
 

Mosh

New Member
http://www.auesignframes.com/ these guys are MM's on here. 90% of the time the contractor will install so I just supply the panel and sometimes one of these post systems.
Depends on how much they want to spend, the 4x4 deal posted above work great to for a lower budget.
 

GVP

New Member
http://www.signs101.com/forums/showthread.php?64145-need-your-input

I like making these T-Frames for easy-to-install MDO signs. No digging necessary, and completely re-usable.
Pics/Diagram/Description in that thread, but the legs are basically a "T" of 4x4's supported with 45degree 2x4's. drill holes in the legs and pound 2-3ft of rebar through it and into the ground.

noted: that picture in the thread was of a frame I had designed on site to work with the slope of the hill it was installed on. I'll usually attach all my legs on one plane, like the diagram in that same thread.

Exactly. +1
 
Top