Curious as to how many of you have applied for sign permits only to discover the City requires engineering for every wall sign to be installed on a building.
This is a first for me. Did not include the fees in our quote.
AND.......what type of info is needed to get these drawings stamped (attachment method, wall type, anything else?)?
Input is appreciated. I don't like being sideswiped!
This is a first for me. Did not include the fees in our quote.
AND.......what type of info is needed to get these drawings stamped (attachment method, wall type, anything else?)?
Input is appreciated. I don't like being sideswiped!