Mosh
New Member
.080 with 1" Aluminum angle welded to the back then plan to install aluminum gemini letters on that.....
Subbed out the welding cause I am busy, I get them back the panels are worped from using too much heat. Instead of grinding off the paint where the welds went they just turned up the heat to burn through the paint.....I wasted 5 sheets of .080 and over 100 feet of angle. I redid them my self.....AAAHHHH
Then the letters showed up from Gemini THE WRONG COLOR!!! They admit it to be their mistake but have not called me back to let me know when I can expect the replacements.
I am ready to call it a day!
Subbed out the welding cause I am busy, I get them back the panels are worped from using too much heat. Instead of grinding off the paint where the welds went they just turned up the heat to burn through the paint.....I wasted 5 sheets of .080 and over 100 feet of angle. I redid them my self.....AAAHHHH
Then the letters showed up from Gemini THE WRONG COLOR!!! They admit it to be their mistake but have not called me back to let me know when I can expect the replacements.
I am ready to call it a day!