well, Saturday I had my employee help out & we loaded up for an install, but then procrastinated a little bit, then got distracted a bit & started the prep for a new directory going up in my own building... & when we had succeeded in waiting until there was not enough time left for our install.. we went & set up 2 extension ladders with ladder jacks & a scaffold plank. Once we got the old sign down we discovered our situation required some rethinking of our install plans. Started getting some rain just as it was getting dark & I was putting the last few screws into the backing board. Thankfully the rain stopped, so the 3 pc. MDO sign went up in the dark just fine thanks to some moonlight on the sign & an interior light the client had on inside the double glass doors we were installing over that helped see to pre-drill & countersink all our mounting screws into our signs border. We just left the final touch-up painting of the screwheads for another day. (Right as we took down the last ladder, we noticed the light inside must have been set to go off at 8:30. Perfect timing)
Sunday I took it easy for most of the afternoon... but then I desided to go finish the demolition job removing 50 PVC directory plaques & 50 plywoord spacer boards. The stepladder wasn't easy to stabalize on the extremely sloaped terrain, with all the planting at the base of the concrete pylon... but I got it set good enough to feel safe... until the sprinklers timer said it was time to water my feet. But I managed to get it done by dark & then I decided to hook a half dozen extension cords together to get my pressure washer & a work light out there & remove 10 years worth of grime off the pylon so it would be ready for a coat of paint today.
So, I'll be working today too. It will be nice to get most of the work on my building directory done when nobody else is around though.