I have a client looking to move his current sign to his new location 2.6 miles down the road. The current pylon sign is about 16 feet tall, and has construction similar to the photo attached (but smaller). We would be subbing the majority of the job out, but before I get too deep into this, is this something that is commonly done? Are there aspects to look out for prior to beginning this?
Again, my role in the project will be basically putting the right people into their positions, with electrical, excavation, and all other aspects being handled by professionals, but I want to enter this as educated as possible.
Thanks for any pointers off the bat.