Gino
Premium Subscriber
How many of ya don't do everything in-house ??
Well, I needed something fabricated by another vendor and I gave them the specs, drawings and everything else needed in getting me a price, so I could finish the quote for our customer. I did this on the 19th of December. I sent out another reminder of this much needed pricing yesterday. Today, I got an answer that his supplier is closed this week for the holidays and he can't get me a price til next year..... with a little LOL behind it. I did not think it was funny, not one bit. Had he quoted on it back around the 19th or any time during that week, I'm sure his supplier would've been open.
This incompetence really burns my butt. I can deal with lotsa things, but this guy is good at what he does and has a rather lackadaisical attitude towards these things at the most inopportune times.
This is exactly why I don't like depending on others for any part of a job. That sub-out crap is just that..... sub-par in ethics.
Well, I needed something fabricated by another vendor and I gave them the specs, drawings and everything else needed in getting me a price, so I could finish the quote for our customer. I did this on the 19th of December. I sent out another reminder of this much needed pricing yesterday. Today, I got an answer that his supplier is closed this week for the holidays and he can't get me a price til next year..... with a little LOL behind it. I did not think it was funny, not one bit. Had he quoted on it back around the 19th or any time during that week, I'm sure his supplier would've been open.
This incompetence really burns my butt. I can deal with lotsa things, but this guy is good at what he does and has a rather lackadaisical attitude towards these things at the most inopportune times.
This is exactly why I don't like depending on others for any part of a job. That sub-out crap is just that..... sub-par in ethics.
Okay, rant over. I feel better now. Anyone else have times like this ??