WB
New Member
1st off, I'm a 1 man show and I 95% only do installations. So normally I make the call whether I need/want/should charge for OT on certain jobs.
I recently got asked to quote on a large job (for me) 8-10 vehicles that need rebranding which means removeale and installation, everything from Caravan, to 32' cube trucks.
So I've submitted most of my pricing everything looks good but then I was asked to give an overtime rate and I said basically it 50% and I got a surprised response on the phone. She said most of her installers were asking 25% more for evening and weekends. I've included in my pricing hiring another installer for help at $50/hr
I understand that it's really only the labour cost that goes up for the same job, but if labour costs are 75%-85% of the total cost for the job and and that cost is going up 50% then I need to charge another 37-43% in order to cover that cost.
Anyway. what do you guy charge?
Thanks
I recently got asked to quote on a large job (for me) 8-10 vehicles that need rebranding which means removeale and installation, everything from Caravan, to 32' cube trucks.
So I've submitted most of my pricing everything looks good but then I was asked to give an overtime rate and I said basically it 50% and I got a surprised response on the phone. She said most of her installers were asking 25% more for evening and weekends. I've included in my pricing hiring another installer for help at $50/hr
I understand that it's really only the labour cost that goes up for the same job, but if labour costs are 75%-85% of the total cost for the job and and that cost is going up 50% then I need to charge another 37-43% in order to cover that cost.
Anyway. what do you guy charge?
Thanks