I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes.
Click to Support Signs101 ...
Installed last week. We did the entire storefront including the ACM staging panel and awning. Only regret is that we were not able to push the entire thing over the last row of bricks because of structural issues on the building.
The panels are 2" deep and have an aluminum tube frame inside. We mounted aluminum angle along the top where the panels go, placed the frame to sit on the angle then drove screws through the tops of the panels down into the angle aluminum. Then once the awning was installed we drove screws up from the inside of the awning into the bottom of the black panels.
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.