Hi Everyone,
We are new in the sign industry and would like your opinion and comments. We have been outsourcing most of our banners/graphics/digital signage but have gotten to a point where we will be producing them in house (picked out most of the equipment with the help of the members of this forum, thanks again). We have the following equipment coming:
HP Latex 360 w/ Flexi Sign Pro for the RIP
Graphtec 8600 -160
Ustech Pro Laminator 64"
Keen Cut Evolution2 104" to be mounted to table
Epson F2000 DTG printer and Pre-Treater
We have 2 rooms which are side by side and are rectangular in shape (36' x 24').
In one room we plan on putting the 2 printer, the cutter and the laminator. This room will be humidity and temperature controlled with minimal dust.
The other room will have the table with the cutter mounted to it, another smaller table for the grommet machine on it, a third for 2 heat presses and the pretreater and we were thinking on making a fourth table for finishing and possible putting a cutting pad over the whole surface.
Is there an optimal way to set up the equipment?
Should one pc of equipment be next to another as a rule of thumb?
Is there an optimal size for a finishing table?
Is there a certain amount of distance away from walls or windows each pc of equipment should have?
I'm sure I may not even be asking the right questions or thinking of other important factors, so any information or feedback based on your experiences would be helpful.
Thank you in advance,
Pete
We are new in the sign industry and would like your opinion and comments. We have been outsourcing most of our banners/graphics/digital signage but have gotten to a point where we will be producing them in house (picked out most of the equipment with the help of the members of this forum, thanks again). We have the following equipment coming:
HP Latex 360 w/ Flexi Sign Pro for the RIP
Graphtec 8600 -160
Ustech Pro Laminator 64"
Keen Cut Evolution2 104" to be mounted to table
Epson F2000 DTG printer and Pre-Treater
We have 2 rooms which are side by side and are rectangular in shape (36' x 24').
In one room we plan on putting the 2 printer, the cutter and the laminator. This room will be humidity and temperature controlled with minimal dust.
The other room will have the table with the cutter mounted to it, another smaller table for the grommet machine on it, a third for 2 heat presses and the pretreater and we were thinking on making a fourth table for finishing and possible putting a cutting pad over the whole surface.
Is there an optimal way to set up the equipment?
Should one pc of equipment be next to another as a rule of thumb?
Is there an optimal size for a finishing table?
Is there a certain amount of distance away from walls or windows each pc of equipment should have?
I'm sure I may not even be asking the right questions or thinking of other important factors, so any information or feedback based on your experiences would be helpful.
Thank you in advance,
Pete