Chriswagner92
New Member
Good Morning sign people
I was laminating some prints this morning, and had the thought "What if i only print on Mondays and Tuesdays, laminate and cut on wednesday, and keep Thursday and Friday open for installs." Right now I print as much as i can on a media and switch it if i need to, so I could be doing 2 jobs on 30" roll, 4 on a 54" roll and then have to switch back to the 30" to finish something later in the day, so there is a lot of loading and unloading of the media. I can see that if I switch to scheduled printing my turnaround time will go up, and will probably leave me with more "leisure" time. It may also help to note that i use an sp540v.
What do you guys do?
I was laminating some prints this morning, and had the thought "What if i only print on Mondays and Tuesdays, laminate and cut on wednesday, and keep Thursday and Friday open for installs." Right now I print as much as i can on a media and switch it if i need to, so I could be doing 2 jobs on 30" roll, 4 on a 54" roll and then have to switch back to the 30" to finish something later in the day, so there is a lot of loading and unloading of the media. I can see that if I switch to scheduled printing my turnaround time will go up, and will probably leave me with more "leisure" time. It may also help to note that i use an sp540v.
What do you guys do?