the graphics co
New Member
I am looking for tips and suggestions on an installation. It is a temporary piece that is roughly 200 sq.ft., They say it will be up for less than a month, but we all know how that goes. The weather is up and down lately, but it will definitely be below 50 degrees here in Chicago. The graphics will be installed on a glass store front, what would be the best material combo, and do i need to do any additional prep for the cold surface temps? Keep in mind i will also have to remove these at some point in the near future.
Thanks in advance,
Cameron
Thanks in advance,
Cameron