anotherdog
New Member
I'm installing a 48ft long x2ft high dibond sign made up of 8ft panels. since it's still cold this time of year, what kind of expansion should I expect in the hot summer months? I'll be installing to a wood frame bolted to the building.
Should I install with a gap?
Should I install with a gap?