Good morning all,
We just bought a take up rail for the 540 because we have a large job producing a series of posters for a number of locations.
The posters have high res photos on them so the files are not small. My dilema is this: we want to run the printer all night, & my boss wants to run 58 separate posters together in each run.
That means I either attempt to export them as an EPS from flexi and bring in as one unit into Versaworks (the bosses idea) or I save them in groups and nest them in Versaworks or export them as individual jobs and que them up in the rip.
What's the smart way to do this? If there's any pause between jobs and the printer resets itself my take up rail will stop functioning and my posters will roll out into the room all night. Maybe I could que them up and find a way to stop the reset action?
Once again I thank you.
I'm experimenting with the nesting option right now..
We just bought a take up rail for the 540 because we have a large job producing a series of posters for a number of locations.
The posters have high res photos on them so the files are not small. My dilema is this: we want to run the printer all night, & my boss wants to run 58 separate posters together in each run.
That means I either attempt to export them as an EPS from flexi and bring in as one unit into Versaworks (the bosses idea) or I save them in groups and nest them in Versaworks or export them as individual jobs and que them up in the rip.
What's the smart way to do this? If there's any pause between jobs and the printer resets itself my take up rail will stop functioning and my posters will roll out into the room all night. Maybe I could que them up and find a way to stop the reset action?
Once again I thank you.
I'm experimenting with the nesting option right now..