Hello All, just got a call from a longtime client... he needs an estimate on approx. 3600sqft of frosted sparkle Vinyl... and then says oh yeah, i need this by tomorrow night?? we've never installed this much at once..., especially frosted vinyl .... im confident in my installers abilities, but the most we've done, is a about 1000-1200 sqft at once, and usually printed vinyl...... i'm trying to figure the best method to estimate it? ive used $3 a sqft on install only jobs,but nothing on this scale...
this a new construction "big box retailer" .. all work is 4' off the ground, interior mounted... get this.. one layer on top of another... is this common ?? also should these be done wet or dry... if had most success with dry, but was wondering if wet will speed it up?, and am thinking that wet on top of the 1st layer might be hard to evacuate... not being able to but as much pressure as on the glass..
the bid requires us to supply and install all material.... i got the material part figured, but was wondering what the norm is to price this... not actual pricing, but formula.. by the square ft, or by the hr.. and what is the norm for this.... i was figuring 3 men 3 days? is this an appropriate time? ( i day sizing the film in the shop , 2 days on the install??
if this is in the wrong section i apologize in advance, ..but am trying to figure this out on a short notice... im open to any suggestions..
this a new construction "big box retailer" .. all work is 4' off the ground, interior mounted... get this.. one layer on top of another... is this common ?? also should these be done wet or dry... if had most success with dry, but was wondering if wet will speed it up?, and am thinking that wet on top of the 1st layer might be hard to evacuate... not being able to but as much pressure as on the glass..
the bid requires us to supply and install all material.... i got the material part figured, but was wondering what the norm is to price this... not actual pricing, but formula.. by the square ft, or by the hr.. and what is the norm for this.... i was figuring 3 men 3 days? is this an appropriate time? ( i day sizing the film in the shop , 2 days on the install??
if this is in the wrong section i apologize in advance, ..but am trying to figure this out on a short notice... im open to any suggestions..