OldPaint
New Member
loaded it up with greenware, last nite 10-11 pm. started firing bout 11 pm. midnite i kicked it up to high fire. went out this morning bout 10 am and it was done. spent most of the day cooling down. opened it 6 pm. this was hennies 1st kiln opening ever. i checked the electric meter before and after, to see how much power it would consume. 14 kw. not bad for gettin 1650 degrees!!!! now we get to play in the chemicals.....GLAZE.......thats what most of the small square pieces will be. i can put a glaze on each to know what each glaze will look like at different cone firing.