I have quoted a customer (7) 25' x 25' mesh banners with a framing system.
Original they were going to installed on walls, now I'm being told they need
to be installed between columns.
I’m wondering if we used the framing system and the
contractor put I-bolts every 4’ down on both sides of the columns
& ran steel cable, pulled tight, across… Would that be enough support?
Or would it be better to have strapping sewn in all four sides with D-rings
and just skip the banner system all together.
Any thoughts would be greatly appreciated.