The Giraffe
New Member
Hi all,
I have a small (8 character) install coming up. I have to install 18" tall PVC letters on a building with 3/4" battens every 4'. I'd like to use the same threaded studs I'd use on a flat wall and use threaded plastic spacers to set them at the correct height. My biggest concern is drilling in the correct place with my template as it's going to cave in around the trim pieces. Any tips or tricks you all could share before I climb the ladder?
I usually get the studs from Gemini but I'm open to other suggestions as well.
Thanks in advance.
I have a small (8 character) install coming up. I have to install 18" tall PVC letters on a building with 3/4" battens every 4'. I'd like to use the same threaded studs I'd use on a flat wall and use threaded plastic spacers to set them at the correct height. My biggest concern is drilling in the correct place with my template as it's going to cave in around the trim pieces. Any tips or tricks you all could share before I climb the ladder?
I usually get the studs from Gemini but I'm open to other suggestions as well.
Thanks in advance.