Abraxas Aguilera
New Member
What sort of wording do you use on your mockups to state that the final job may vary slightly from the proof? We installed a 21' x 6' sign that weighs close to 500 lbs. The proof shows the sign a little less that 12" higher than the final placement. We had to move it slightly down because there is a 12" tall steel I beam in the way. If we went higher there is a facade that we would not feel safe hanging that much weight on. We had to go back to talk to the second in command (above the social media guy we've been dealing with) and after explaining it to him he understands. I would just like to add some verbiage to our proof form to COA.