Biff
Biff
Hello,
I am rocking a pair of s2 t140 Summas using Flexi and Summa's Cutter Control Barcode Server. It is working great. However, I have one task I want it to do, but cannot figure out how to do it.
Is there a way to cut off sheets between jobs. In other words, it reads the bar code job > completes it > cuts the sheet from the plotter > starts next barcode job.
I have built a ramp/table to allow this to happen but cannot find the settings to execute it.
Thank you!
Biff
I am rocking a pair of s2 t140 Summas using Flexi and Summa's Cutter Control Barcode Server. It is working great. However, I have one task I want it to do, but cannot figure out how to do it.
Is there a way to cut off sheets between jobs. In other words, it reads the bar code job > completes it > cuts the sheet from the plotter > starts next barcode job.
I have built a ramp/table to allow this to happen but cannot find the settings to execute it.
Thank you!
Biff