We recently printed and installed a large graphics branding project in a neighboring state. We didn't have control over wall prep, painters, type of paint etc.
The job was printed on Arlon 8200X and we were told the painting was 3 weeks cured. We cleaned the walls twice with alcohol/water. They were highly textured but
we squeegeed, rolled and heat set and it would hold temporarily but apparently all the graphics are doing this. I was told from another company that because of supply chain
issues Sherwin Williams changed their formulas, causing issues for a lot of sign companies. It was very shiny paint. Anyone else experience this?
The job was printed on Arlon 8200X and we were told the painting was 3 weeks cured. We cleaned the walls twice with alcohol/water. They were highly textured but
we squeegeed, rolled and heat set and it would hold temporarily but apparently all the graphics are doing this. I was told from another company that because of supply chain
issues Sherwin Williams changed their formulas, causing issues for a lot of sign companies. It was very shiny paint. Anyone else experience this?