appropriate1
New Member
A long time customer asked me to build two billboards with faces 8 x 15 feet, bottom of sign 7 feet off the ground, with only a treated 6 x 6 at each end., set in concrete 12 inches by 96 inches deep. I don't think it is nearly strong enough and will not last their required 15 years. I think posts will crack between the ground and the sign bottom. They are confident it is sufficient, but I have declined the job based on liability for doing something I fear will fail with a strong windstorm. Hiring a structural engineer to run the numbers would cost me $750 and if the engineer agrees with me not to do the job as shown, the fee cannot be recovered. So, any opinion on the structure? Any opinion on saying no when I think I am right? I've been doing this 41 years and never fixed one of my own, but plenty of other failed bilboards. Thanks. Rob