• I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes. Click to Support Signs101 ...

Search results

  1. Need Help help with signlab software on new pc

    When ever you go to purctohase 2nd hand equipment with software, it is your responsibility to check with the software company to see if the software is transferable. just purchasing it and having a dongle doesn't mean its a legal .
  2. How much should I charge for 20 truck trailor lettering/decals for each of them 75 squre ft dealingr

    Hourly rate+(material cost*%markup)+design time+time to produce= price each do not discount until the end of complete job.
  3. Need Help Need 4 fluorescent bulbs

    I already said that in post #4!
  4. Need Help What a FAIL. Glass door all scretched up. Anything to fix it?

    if and when cleaning a window with razor scraper make sure the blade is Stainless Steel and not carbon. Carbon blades will scratch glass! Also alway keep it wet
  5. Need Help Need 4 fluorescent bulbs

    Check with one of you local electrical suppliers they may have them or can get them, but their price is usually higher than sign supplier. When I told one of my local electrical supplier what I get them for he said it was lower than he can get them!
  6. Gerber AR router material holder

    picture of one would be helpful.
  7. Mr. ”T” (aka Tony Teveris from Gerber Scientific) is RETIRING!!1

    He was always willing to help and looked to keep the software up to date and adding improvements. Good Luck Tony and Thank You.
  8. Suggestions Fibron Heat-Transfer Vinyl on GORE-TEX Rain Gear

    Most Gore-Tex outer wear also have a coating on the outer shell! Also not sure how much heat the Gore-Tex membrane can take.
  9. Peterbilt passenger door measurement

    you guys that said you have done a ton why not check one of the files for the size of what you place their.
  10. Discussion Cost for frosted vinyl and installation.

    It doesn't matter what the another company charges they have different overhead. If you are in business you need to figure out what you need to make to stay in business and grow. It may be as simple as (material + markup +(length of time x hourly rate))= what you charge
  11. Need Help Gerber Composer crashes when paper printing

    What OS does the computer have?
  12. Suggestions Vinyl for Bare Sheetrock

    Also over all the screws/nails used to install the sheets. Also will the paper support the vinyl over time.
  13. Suggestions Re-creating channel letters for existing sign

    If the boss want to route them, then as Brad said the old one make templates for a hand route with the correct bit :-{) they would be routed then. just not CNCed.
  14. Question Are you a bitter, cranky old sign guy?

    most shops have heat :-{)
  15. Lexan mark up

    Does it really matter what everyone else does?
  16. Need Help Brick wall vector

    try here Brick Wall 30 – Allied Computer Graphics
  17. New Product modular LED panels

    Yes I do get it, you are the one that doesn't, if you assemble these with multiple units/modules, it still need to be UL. Like I said originally UL parts doesn't make the cabinet UL. Hope nothing seriously go wrong for you or you may be in a heap of trouble installing something not correctly...
  18. New Product modular LED panels

    Assembling a sign cabinet from UL listed parts doesn't make the cabinet UL approved! If you do not proved supplier name and part numbers and also have these signed UL approved I don't see hao you can put customer at ease, in my area all signs need to have to be UL approved.
  19. New Product modular LED panels

    If you are manufacturing an LED sign are UL certified, what will happen if you go out of business will another sign company be able to work on get parts, are you supplying a schematic with part number for future service.
Top