Stacey K
I like making signs
I have a customer who wants me to wrap the bottom half of a camper similar to the one pictured with all the ribs. Clearly this is a 2 person job but I've never done anything with all these ribs. How long will something like this take? Anything I need to consider? With cleaning and cutting around the hitch, etc. does 6-7 hours sound right? My helper will not be experienced, just another set of hands.
2 sides at 130"x32" each
2 ends at 78"x32" each
About 96 square feet total.
2 sides at 130"x32" each
2 ends at 78"x32" each
About 96 square feet total.