Blaney
New Member
Tuesday morning I had a repeat customer come in the shop. He wanted a 4 x 8 MDO basic sign ASAP. I told him I could have it done the next day, but if he wanted me to install it, it would be Friday before I could do it. I explained I had to have the utilities located first. Shop policy states nothing goes in the ground without locating the utilities first. He told me to cancel the order and that he would find another shop that didn’t have a “stupid policy”.
I went by the site yesterday afternoon and sure enough, a sign was up. The sign was made by a guy who makes signs part time and under cuts everyone.
How many of you will put a sign post in the ground without having the utilities located first? Do you locate only if you dig? Do you locate if you pound a channel post in the ground? I’m wondering how dumb of a policy it is. I think it’s better to be safe than sorry.
I went by the site yesterday afternoon and sure enough, a sign was up. The sign was made by a guy who makes signs part time and under cuts everyone.
How many of you will put a sign post in the ground without having the utilities located first? Do you locate only if you dig? Do you locate if you pound a channel post in the ground? I’m wondering how dumb of a policy it is. I think it’s better to be safe than sorry.