Happy Holidays ........... haven't been around in a while.
I just finished 3 of these vans. I am looking for your input on installation cost ONLY and ONLY as the solo freelance installer. All graphics provided as well as materials ........ only your hands eyes and expertise needed. Travel is 10 miles to the job site and you would be pricing as an independent contractor NOT a large sign company.
Stats: All 3M Control tack ... a few reflective graphics and perf vinyl for windows.
Time: At a moderate pace I was able to get one van down DRY ... in 5-6 hours ... at best. The strip on the bottom is not extremely bad but takes more time I did it in one full length shot. The perf is also time consuming since the non perf has to go on first...you get the point.
The remaining graphics are straight forward ...... definite cut in on the doors etc .......... some heating going on especial in the channels ........
Question:
1 - I am looking for your HONEST estimate in time per van (1) person doing the work .... they want it done right ... not with crazy bubbles and slicing of rubber seals which others did ...
2 - What is your charge as an independent to go on site .................... FIRST per vehicle .................. and then if they offered you to do 200 vehicles .........
Thanks for your feed back .............. Mike
Edit: If you only wish to give info in PM ... that's cool!
I just finished 3 of these vans. I am looking for your input on installation cost ONLY and ONLY as the solo freelance installer. All graphics provided as well as materials ........ only your hands eyes and expertise needed. Travel is 10 miles to the job site and you would be pricing as an independent contractor NOT a large sign company.
Stats: All 3M Control tack ... a few reflective graphics and perf vinyl for windows.
Time: At a moderate pace I was able to get one van down DRY ... in 5-6 hours ... at best. The strip on the bottom is not extremely bad but takes more time I did it in one full length shot. The perf is also time consuming since the non perf has to go on first...you get the point.
The remaining graphics are straight forward ...... definite cut in on the doors etc .......... some heating going on especial in the channels ........
Question:
1 - I am looking for your HONEST estimate in time per van (1) person doing the work .... they want it done right ... not with crazy bubbles and slicing of rubber seals which others did ...
2 - What is your charge as an independent to go on site .................... FIRST per vehicle .................. and then if they offered you to do 200 vehicles .........
Thanks for your feed back .............. Mike
Edit: If you only wish to give info in PM ... that's cool!