OhioSigns
New Member
$0.50 / Sq.Ft. = $9 on a 3' x 6' per side for mounting. Each one should take less than 10 minutes to wipe down the substrate and mount with my laminator. I'm sure if doing 8 of them you could mount all 8 in an hour or less which would be $72 and my shop rate is $65 / HR, so yeah $.50 / Sq.Ft. is where I would be..50 for installation?