I want to thank all the members that have upgraded your accounts. I truly appreciate your support of the site monetarily. Supporting the site keeps this site up and running as a lot of work daily goes on behind the scenes.
Click to Support Signs101 ...
You can adjust the downforce in PM and those settings will over-ride whatever the settings on the actual plotter are. I know the display on my Summas will look correct but when I send a file they will change to whatever the PM settings are. As soon as the job is finished the Summa display will...
Downforce in production manager turned to zero or the incorrect tool selected. If the settings on the plotter are correct and the blade holder is installed correctly that's about the only option you have left.
If they're refurbishing equipment just wait until they've got it cleaned up to go measure it.
I did replacement work for a local company for a long time. They would buy old equipment, rebuild it, repaint it, and sell it at auction. John Deere and Caterpillar absolutely shot me down on doing...
4MM Coro with vinyl lettering....about a year before the coro is brittle and flaking. Two years and there won't be much left.
I have to admit that I've done several temporary backlit faces like that over the years.
Another thing to consider would be the material cost. Maybe it's different...
If I looked that up correctly the price is $26 for a gallon of parts A & B and will do 8 holes. That's comparable to quickcrete.
Biggest problem I see is having to wait an hour before installing a sign. Right now, for most of what I do, I can set the posts, install the sign, level everything...
Here's one for you....whoever lettered that one lettered it WRONG. That's not the correct font.
Pull up images for Union Pacific rail equipment and look at the letter C. Union Pacific uses a letter with slanted ends....that car has vertical ends on the C. The letter N should be pointed.
The...
Just clicking through one of the logo design people's links he's from India, he's got 45 orders in the works right now, has a 3 day turn around and if you want editable files from him it's $20 extra. I don't think I'm gonna make $1125 in the next three days.
The really interesting part is that...
This site uses cookies to help personalise content, tailor your experience and to keep you logged in if you register.
By continuing to use this site, you are consenting to our use of cookies.